Specifications
DIMENSIONS
– LENGHT OVERALL: 33.28 m (109’)
– LENGHT ON WATERLINE: 29.71 m (97’4’)
– BEAM: 7.12 m (21’7’’)
– MAX DRAFT: 1.30 m (17’3’’)
– DISPLACEMENT AT FULL LOAD: 105t (231,485 LBS)
– DISPLACEMENT AT HALF LOAD: 98t (216,053 LBS)
PROPULSION
– MAIN ENGINES POWER: 2 X MTU 12V 4000 M90 2735 HP each
– HOURS PORT 1,702 – STBD 1,693
– TRANSMISSION: 2 X KAMEWA63 S 3
– GENERATORS: 2 X KOHLER 33EFOZ @ 33kW each
– HOURS PORT 3,940 – STBD 3,940
– STABILIZER: (Installed 2018) 1 X SEAKEEPER mod. 26
TANK CAPACITY
– FUEL CAPACITY: 14,700 L (3,883 US GALS)
– WATER CAPACITY: 2,000 L (528 US GALS)
– GREY & BLACK WATER: 1,600 L (422 US GALS)
ACCOMMODATION
– GUEST CABINS: 1 OWNER + 2 VIP + 1 TWIN (+ Pullman berth)
– CREW CABINS: 1 SINGLE CAPTAIN + 2 TWIN CREW
PERFORMANCE
– MAX SPEED HALF LOAD: 34 KNOTS
– MAX SPEED FULL LOAD: 30 KNOTS
– CRUISING SPEED HALF LOAD: 30 KNOTS
RANGE AT ECONOMICAL
– CRUISING SPEED: 350 NAUTICAL MILES LONG
PROPULSION
REDUCTION GEARS
Two flange-mounted reduction gears ZF model 4650 with a reduction ratio selected in accordance to Kamewa
WATERJETS
Two waterjets Kamewa (RRAB) model 63 S3 connected to the output flange of the gearbox by means of a coupling supplied by Kamewa
STEERING SYSTEM
Kamewa WJ steering system
DIESEL GENERATOR
Two Kohler EFOZ 33kW marine generator, each having a capacity of 33 kW
BOW THRUSTER SYSTEM
Hydraulic Bow Thruster BCS 47 kW
ONBOARD SYSTEM
FUEL SYSTEM
Direct suction from structural GRP tank through two RACOR fuel pre-filter supplied by MTU and WESTFALIA OTC2 Fuel purifier
BILGE / FIRE FIGHTING PUMP SYSTEM
• Gianneschi bilge pumps and fire fighting
AIR CONDITIONING SYSTEM
• Frigomar (2 new inverters)
LIST OF RECENT WORKS 2020-2022
Equipment replaced or overhauled
– Most of the engine room electrical circuit breakers are new
– Overhaul of all engine cylinder heads
– Overhaul of all engine injectors
– Engines fresh water circuit and seals
– Portside engine fresh water pump
– Engine intercooler circuit and seals
– Engine thermostats are new
– Engine keys
– Major revision of the Hamann system (wastewater) + installation of a remote control system for the
Hamann
– New air conditioning compressors
– Air conditioning circulation pump
– Engine room automatic bilge pump new
– Overhaul of the watermaker
– 1 new starboard fire damper
– Revision of ZF inverters
– Seakeeper stabilizer overhaul
– Westfalia major overhaul (diesel centrifuge)
– New engine batteries
– New generator batteries
– New backup batteries
– Overhaul black water / gray water transfer pump
– Overhaul and cleaning of the shore power converter
– Revisions of the Humphree (flaps)
– Revision of underwater lights
5 years Bureau Veritas visit
– Overhaul of the Diesel Fire Valve
– Major revisions of generators (injectors, endoscopes, rocker arm adjustments, diesel pumps, sea water
pumps, etc.)
– Engines endoscopy
– Mega test
– Complete overhaul of the Kamewa jets
– Cleaning & inspection of fresh water tanks
– Cleaning & inspection of diesel tanks
– Cleaning & inspection of the gray water & black water tank
– New valves at the waterline and under the waterline
– New 24V fire and bilge pumps (2022)
– 400 fire pump & bilge overhaul
– Dismantling and revision of both windlasses
Others
– New screens and yacht management system
– 90% of the air conditioning transformers and fan coils are new
– Major upgrade of the Audio system (amplifiers, remote controls, speakers, wifi)
– New TV & Hi-fi inverters
– New screen and navigation system + 1 GPS
– Dismantling & overhaul of swim ladder & cylinder
– New master cabin water heater
– Foredeck teak new caulking
– Overhaul of the tender (changed silent block, alternator, turbo…)
– Change of all gangway hydraulic hoses and overhaul of cylinders.
– Change of the hydraulic hoses of the cranes for the jet skis